Global Innovator in the Manufacture and Supply of Injection Molded Cable Management Products 513-201-3069

Assembly

kdh_stanz_mon_1
Establish and mark cut-outs.

Caution:
Ensure sufficient distance between the press cuts!

Mark drilling point for the pilot hole for the tension screw and punch out the pilot hole for the tension screw.
kdh_stanz_mon_2
Screw in corresponding tension screw into the tool head and close the valve on the punching tool. Push on appropriate spacer and die.
kdh_stanz_mon_3
Insert tension screw into pilot hole. Stick or screw stamp onto tension bolt. Secure with lock nut where needed. Align die and draw in lock nut by hand.
kdh_stanz_mon_4
Activate hydraulic mechanism until the press cut is completed. Then actuate 3 – 4 further strokes. This ensures an easier removal of the plate from the die. Caution: If excessive force is required, inspect the hydraulic tool and punching tool! Observe the tool's operating instructions.
kdh_stanz_mon_5
Remove hydraulic tool from the cut-out. Open valve and remove lock nut and stamp. Remove plate from the die.
Displaying Metric Units

Your data. Our responsibility.
Thank you for your interest in our company. Data protection is of great importance for us because of our business activities!
We want you to know how much we value the protection of your data and privacy.
Our transparency documents in accordance with Art. 13 and 14 and 21 of the Basic Data Protection Ordinance (DS-GVO) are available for download here: